NEW YAMUNA BRIDGE

                                

                                              (New Yamuna Bridge) 

                                                 Carries- 6lane , pedestrians, and bicycle
                                                Location- Allahabad
                                                Design- Cable Stayed Bridge 
                                                Material- Steel
                                               Total Length- 1510 m.
                                               Width- 250 
                                               Designer- Hindustan construction company &
                                               Hyundai Engineering & cons.
                                               Construction- 2000-2004


The New Yamuna Bridge is a cable stayed bridge in Allahabad. The bridge was constructed by the Hindustan construction company and Hyundai Engineering and constructions company in end of 2004 with the aiming that to reduce the traffic of Naini Old Bridge. 

The total length of bridge is 1510meter with a longest span of  260 m which is supported by a cable which stay in concrete anchor bridges.




Comments