(New Yamuna Bridge)
Carries- 6lane , pedestrians, and bicycle
Location- Allahabad
Design- Cable Stayed Bridge
Material- Steel
Total Length- 1510 m.
Width- 250
Designer- Hindustan construction company &
Hyundai Engineering & cons.
Construction- 2000-2004
The New Yamuna Bridge is a cable stayed bridge in Allahabad. The bridge was constructed by the Hindustan construction company and Hyundai Engineering and constructions company in end of 2004 with the aiming that to reduce the traffic of Naini Old Bridge.
The total length of bridge is 1510meter with a longest span of 260 m which is supported by a cable which stay in concrete anchor bridges.
Comments
Post a Comment